Rugged-ridge All Terrain Fender Flare Kit, 87-95 Jeep Wrangler Bedienungsanleitung

Stöbern Sie online oder laden Sie Bedienungsanleitung nach Für das Auto Rugged-ridge All Terrain Fender Flare Kit, 87-95 Jeep Wrangler herunter. Rugged Ridge All Terrain Fender Flare Kit, 87-95 Jeep Wrangler (YJ) User Manual Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 4
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
Rev. 11/11
Page 1 of 4
SB
PLEASE READ AND UNDERSTAND ALL INSTRUCTIONS BEFORE YOU BEGIN.
YJ: 11630.10
CJ: 11633.10
CJ/YJ ALL TERRAIN FLARE KIT
HARDWARE LIST:
1. M5 Socket Head
Cap Screws-(28)
2. M5 Flat Washers-(28)
3. M5 Flange Nuts-(28)
4. 7mm Rubber Spacers-(22)
5. 13mm Rubber Spacers-(10)
6. Edge Trim-(1 roll)
7. Edge Trim Tool
REQUIRED TOOLS:
1. Drill
2. 1/4” Drill Bit
3. 6mm Allen Wrench
4. 10mm Wrench
5. 5/16” Wrench
6. Felt Tip Marker
7. Scissors
8. Isopropyl Alcohol
*See page 3 for optional painting instructions.
*See page 4 for optional fender trimming for over 33" tires.
Step 1. Remove front factory side markers. Do not discard front markers,
they will be reused. Remove all ares including the front are
extensions. Clean body surface where new ares will mount.
Temporary removal of rear fender well liners may be necessary for
installation of ares.
Step 2. Clean inside mounting lip edge with rubbing alcohol. Install edge
trim as shown in the gure, removing red vinyl tape covering only a
few inches at a time. Do not pull trim while being applied, this may
cause shrinkage after installation.
Step 3. Installing the front ares. Use the front marker light mounting holes
for are alignment. With the marker light temporally installed, align
the bottom of the rear edge of the are with the bottom edge of the
body. Once the are looks aligned, mark the mounting holes with a
felt tip marker. Next remove the marker light and drill the bolt
mounting holes using a 1/4” drill bit. Repeat the same procedures for
both front fender ares.
Step 4. Installing the rear ares. Align the bottom rear edge of the are with
the vertical body panel seam towards the rear corner of the vehicle
and the bottom front edge with the bottom of the body. Once the
are looks aligned, mark the mounting holes with a felt tip marker.
Next remove are and drill the bolt mounting holes using a 1/4” drill
bit. Repeat the same procedures for both rear fender ares.
YJ: 11632.10
Seitenansicht 0
1 2 3 4

Inhaltsverzeichnis

Seite 1 - CJ/YJ ALL TERRAIN FLARE KIT

Rev. 11/11Page 1 of 4 SBPLEASE READ AND UNDERSTAND ALL INSTRUCTIONS BEFORE YOU BEGIN.YJ: 11630.10CJ: 11633.10CJ/YJ ALL TERRAIN FLARE KITHARDWARE LI

Seite 2

Rev. 11/11Page 2 of 4 SBYJ: 11632.10CJ: 11633.10CJ/YJ ALL TERRAIN FLARE KITStep 6. Install the hardware as shown in the image. First place a wash

Seite 3 - REV 11/13/09

OPTIONAL PAINTING INSTRUCTIONSNOTICE: Do not use any harsh chemicals on flares. Use only plastic approved cleaning chemicals.CUT OUT FLARE PAINT PREPA

Seite 4 - CJ: 11633.10

OPTIONAL FENDER TRIMMING INSTRUCTIONSNote: Image of suggested cut lines are to be used as a guide only. Fenders may be trimmed less

Kommentare zu diesen Handbüchern

Keine Kommentare